REQUEST for PREQUALIFICATION OF PROPOSERS for the NETWORK TECHNOLOGY PROJECT, RANCHO CAMPANA HIGH SCHOOL

WORD VERSION – RCHS Tech RFP – Project Manual 1 of 2 – Required Proposal Forms

 https://www.dropbox.com/sh/7fop7fmegfmqkvr/AABp61r-Bn2N7uFOuFwEzNyfa?n=365811358

RFP Network Technology Project #536 – Rancho Campana High School

Click here to view RCHS Tech RFP

 

Does the PSA need to be signed and submitted with the Questionnaire, the RFP or the Award?

Signature on the PSA is required when the project is awarded.

Can a respondent submit a partial bid that includes only a portion of the equipment listed (i.e. switching and UPS requirements)?

The responder must submit a complete proposal for all technology domains described in the RFP. If the responder is unable to satisfy a portion of the RFP scope, they should indicate the reason (e.g., no suitable subcontractor arrangement, no certifications held, no reseller arrangement) and recognize that they run the risk of the proposal being deemed unresponsive.

If a respondent bids a vendor other than Motorola for wireless (e.g. Cisco), will the AP's still have to interoperate with Motorola's AirDefense?

Optimally, yes. An alternate solution would need to burden the proposed solution with a policy and management engine that is compatible with both Motorola and the proposed wireless solution and to include all necessary professional services to convert the existing Motorola deployment to the new proposed policy and management platform.

Does the WAN support multicast?

Yes

Will the WAN be upgraded to 10G?

The WAN is already delivered as a 10 Gb backbone to the district from each campus.

What is the expectation for the 'bid alternate' under Appspace?

There is currently no native method within the appspace.com solution to display Show and Share content on Cisco DMPs. But appspace.com has customizable modules that can be developed to extend the capabilities of the platform.  The bid alternate is an opportunity for the proposer to include professional services to develop a capability using the appspace.com platform to add the function of displaying Show and Share content on Cisco DMPs.  This is not a required component of the overall solution.

What version of DMM and Show and Share is the district currently using?

– Digital Media Manager: Version 5.3.6(RB1)

– Show and Share: Version: 5.3.7

– Cisco MXE: Version: 3.3.2

Does the district currently have a single DMM or two separate DMM's for Show and Share / Signage?

One server each for each of the above systems:

– Server 1: DMM

– Server 2: Show and Share

– Server 3: MXE

Will the district provide its own content for signage and show and share?

Yes

What kind of walls will the signage screens be mounted on - drywall vs concrete, etc?

The walls will be a variety of materials- drywall stucco, CMU. However wherever the drawings call out for a monitor, the contractor will be installing backing. We have attached a picture of a location with backing in place prior to installation of the drywall for your reference.

Can vendors add lines (e.g. Miscellaneous Materials) to the Pricing Quotation Sheet?

Yes

Important clarification on equipment lead times:

A reminder to RFP respondents that the solutions proposed are considered to be complete solutions to be delivered within the project schedule described in the RFP.  If the responder has any concerns about equipment lead times to fulfill the solutions proposed, please identify those products that are of concern for timely delivery, if applicable.

The Terms & Conditions associated with this bid amount to more than 200 pages. Could you grant a one week extension?

Unfortunately, due to the aggressive schedule to complete this school and the E-Rate timeline we are required to meet, we cannot extend the due date on this RFP. Please let me know if you have any questions about specific terms and conditions.

Is proposal security supposed to be 10% of the value of the proposer’s submittal or 10% of the potential bonding requirement in the prequalification process?

The 10% is based on the total amount proposed on this RFP (your exact dollar amount).

 

REQUIRED PROPOSAL SECURITY: Each proposal must be submitted with security in an amount equal to

10% of the maximum proposal, in one of the following forms: (i) a cashier’s or certified check payable to

the District; or (ii) a proposal bond. The security must be submitted with a completed copy of the

“Proposal Security” form included as one of the Required Proposal Forms. Each proposal bond must be

an executed copy of the “Proposal Bond” form included as one of the Required Proposal Forms and

must be issued by a California-admitted surety as defined in Code of Civil Procedure Section 995.120.

Unless forfeited, the District will return security to the proposers within a reasonable time, but not more

than sixty days after award of the Contract for the Work.

During the prequalification meeting, an additional deadline was discussed for any vendor proposing an equivalent to a product line already in use by the District. If that deadline is being applied, what is the date?

Substitutions would be part of the proposal and would be considered along with the overall technical approach when the work is awarded.  As such, substitutions (“or equals”) are due on the proposal due date.  Since they are a basis of award, we would not consider them after the work is awarded.

Clarify discrepancies between Sections 5.0 to 5.5, 5.7 and 5.8 and Exhibit 2 • Section 5.1 Campus Core Switch (Network Core)

1. RCHS requested C6807-XL-S2T-BUN bundle with VS-S2T-10G-XL supervisor module. VS-S2T-10G supervisor module is the only option included with this 6807 bundle.
a. The supervisors do not need to be the XL version. The redundant switch fabrics should match each other.
2. WS-X6848-TX-2T is listed in Exhibit 2 but not listed as requirement in Section 5.1
a. Exhibit 2 is correct. This was an omission in the bullet-point requirements in the Campus Core Switch specification section. There is a requirement for a copper line card in the chassis switch of class and caliber of the reference model WS-X6848-TX-2T.
3. What length of fiber cross connects are required?
a. It has been determined that the SCCS contractor is providing the District a supply of single-mode and multi-mode LC patch cords for the RCHS project. No fiber cross connect patch cords are required for this proposal. Please zero out these line items in the pricing attachment.

• Section 5.2 Campus Edge Switch and 5.3 Server Room Access Switches (Server Access and Edge Switch) 4. What length of fiber cross connects are required?

See answer to Question #3.

• Section 5.5 Computer Lab Access Switches (Computer Lab Access) - 7. Exhibit 2 shows C2960 lab switches but Section 5.5 reference model is C3850 switches

See answer to Question #5.

• Section 5.5 Computer Lab Access Switches (Computer Lab Access) - 8. What length of fiber cross connects are required?

See answer to Question #3.

• 5.7 Indoor Wireless Access Points - 9. What style of outdoor AP enclosure (solid door or see-through polycarbonate door) is required as referenced in Section 1.3.5?

See-through polycarbonate door is not required. Use Oberon #1020-00 or Oberon #1024-00 as reference product.

• 5.8 Outdoor Wireless Access Points - 10. What style of outdoor AP enclosure (solid door or see-through polycarbonate door) is required as referenced in Section 1.3.5?

See-through polycarbonate door is not required. Use Oberon #1020-00 or Oberon #1024-00 as reference product.

Does the entire Project Manual 1 and Project Manual 2 need to be returned with our response, or only pages 19-36 (Required Proposal Forms ) of Project Manual 1, and pages 13 - 45 (Proposers Response) with Attachment A (pricing quotation sheet) of Project Manual 2?

For Project Manual 1, only the completed forms are required. For Project Manual 2 (technical portion of RFP), the entire document with inline responses and Pricing Attachment should be returned.

Are Proposers allowed to convert the RFP to a Word document for the purpose of inserting answers and completing forms? If not, can responses be inserted into the RFP as Adobe text comments? If the proposal must remain in the original PDF format, can responses refer to additional inserted/included pages?

a. Project Manual 1 is now available in Word version on the OUHSD website:
http://www.ouhsd.k12.ca.us/divisions/administrative-services/purchasing-warehousing/rfp/
b. Project Manual 2 is already available in Word (.docx) format from the District RFP website link to the Dropbox document repository. It is called “RCHS Tech RFP – Network Technology Requirements and Questionaire.docx”. Do not use text comments in PDF format. Use inline responses within the provided Word document.

Toggle title

Toggle content goes here, click edit button to change this text.

OUHSD Terms & Conditions

If a firm has an exception to any of the terms and conditions in the RFP for the Network Technology Project, please provide them with your RFP response so they can be reviewed by the District. Thank you.

• Section 5.4 Campus PoE Access Switches (Network IDFs) 5. Increased qty 26 in Exhibit 2 from qty 24 in Section 5.4

Exhibit 2 is the correct quantity.  The 2 computer lab switches that had previously been proposed as type 2960 were rolled into the counts for the IDF switches.  The separate section for the Computer Lab Access switches should be removed.  The two lab switches will still be installed in the respective computer labs and must be designed to uplink accordingly (as opposed to stacking in a nearby IDF) but they will be of the same type as the network IDF switches.

What length of fiber cross connects are required?

See answer to Question #3.